HII Logo

September 12, 2016

HUNTINGTON INGALLS INDUSTRIES CONTINUES TO MAKE STRIDES ON AIRCRAFT CARRIER JOHN F. KENNEDY (CVN 79)

NewsNews ReleaseNewport News Shipbuilding
Share:
HUNTINGTON INGALLS INDUSTRIES CONTINUES TO MAKE STRIDES ON AIRCRAFT CARRIER JOHN F. KENNEDY (CVN 79)

NEWPORT NEWS, Va. (Sept. 12, 2016)--Huntington Ingalls Industries (NYSE:HII) announced today that its Newport News Shipbuilding division placed a 900-ton superlift into dry dock, continuing construction of the nuclear-powered aircraft carrier John F. Kennedy (CVN 79). As Kennedy begins to take shape in the dry dock, the ship’s cost and construction schedule continue on track with significant improvement over its predecessor, the first-of-class Gerald R. Ford (CVN 78).

“We continue to focus on reducing cost, and we are pleased with our progress,” said Mike Shawcross, Newport News’ vice president, CVN 79 carrier construction. “The incorporation of lessons learned from CVN 78 on to CVN 79—and major build strategy changes to construct the ship a different way—are having a significant impact on our construction efficiencies, just as we anticipated they would.”

Like Ford, Kennedy is being built using modular construction, a process where smaller sections of the ship are welded together to form larger structural units (called “superlifts”). Equipment is then installed, and the large superlifts are lifted into the dry dock using the company’s 1,050-metric ton gantry crane.

https://s3.amazonaws.com/cms.ipressroom.com/217/files/20168/57d306a32cfac22802369c34_m161109_SuperLift_5m_1080p/m161109_SuperLift_5m_1080p.mp4

Kennedy is on track to be completed with 445 lifts, which is 51 fewer than Ford and 149 less than USS George H.W. Bush (CVN 77), the last Nimitz-class carrier. “Fewer lifts to the dock means we’re building larger superlifts with more outfitting installed prior to erecting the sections in dock,” said Mike Butler, Newport News’ Kennedy construction program director. “This translates to man-hour savings because the work is being accomplished off the ship in a more efficient work environment.”

Close to 90 lifts have been placed in the dock and joined together since the ship’s keel was laid in August 2015. Kennedy is scheduled to be launched in 2020 and deliver to the Navy in 2022, when it will replace USS Nimitz (CVN 68).

About HII

HII is America’s largest shipbuilder, delivering the world’s most powerful ships and all-domain mission technologies, including unmanned systems, to U.S. and allied defense customers. HII is the largest producer of unmanned underwater vehicles for the U.S. Navy and the world.

With a more than 140-year history of advancing U.S. national security, HII builds and integrates defense capabilities extending from the core fleet to C6ISR, AI/ML, EW and synthetic training. Headquartered in Virginia, HII’s workforce is 44,000 strong.

Related News

June 8, 2026

HII Partner Bayou Metals Launches Dedicated Manufacturing Line to Accelerate ROMULUS USV Production

June 3, 2026

HII’s Newport News Shipbuilding Welcomes High School Graduates Recruited Through Innovative WAVES Program

June 2, 2026

HII’s Lifesaving Support to Casualty Evacuation Operations in Africa Bridges Gap Between Injury and Survival

Sign Up for Updates

Enter your email to receive news updates and insights.

By subscribing you agree to our Privacy Policy and provide consent to receive updates from HII.